QARMAT ALI WATER TREATMENT PLANT & SOURCE WATER PIPELINE PROJECT-PHASE I & II

2023-08-30

PROJECT LOCATION: RUMAILA OILFIELD IRAQ
CONTRACTOR: CPPMEC & CPTDC
END USER: BP ROO
COATING SYSTEM: Internal Primed FBE & External 3LPE/PU Coating for Line Pipes; Internal Primed FBE & External Heat Shrinkable Polyethelene Tape Over An Liquid Epoxy Layer (HSPT) Coating for Bends 
COATING DURATION: JULY 2022~AUGUST 2023

PROJECT BACKGROUND:
The Rumaila oilfield is one of the world's largest oil fields, located near Basra, about 20 miles from the Kuwaiti border in southern Iraq, covering an area of 1,800 square kilometers and owned by Iraq. It was discovered by British Petroleum (BP) in 1953 and began production in 1972. The oil field contains oil at a depth of about 2,400 meters below the surface and currently has more than 200 production wells in operation.
ROO project has higher technical standard, based on API, ISO, ASME and other international standards. Source Water Pipeline is also a priority for the Government of Iraq, with a 25 years pipeline design life and strict requirements for FBE internal coating quality.
CPPMEC & CPTDC, subsidiaries of CNPC, are the Contractors of Phase I and Phase II respectively. Supply scope is 23km 48” coated line pipe for Phase I and 18.6km 48” coated line pipe & 25ea hot induction bends as well as downsize pipes ranging from 8” to 36”.

TYHOO is the only Chinese coating applicator that has been approved by ROO Oilfield. Only two coating plants in the world are qualified by the oilfield.