June 2018, TYHOO has been awarded as the Subcontractor by Saipem to perform the Internal Field Joint Coating(IFJC) service for the Spence Growth Options (SGO) Project in Chile. Tyhoo's IFJC robots are qualified by Saipem and are providing the Internal Field Joint Coating Activities for the pipeline of 36" of transmission of sea water. Tyhoo IFJC robots are applying internal cleaning, internal coating , and performing inspect and test of the internal coating for the girth weld joints of the pipeline main line, tie-in, and crossings/hot bends. The whole construction period is approximate 300 days.